🏛️ Jewal Palace – Electrical A&A Works (Jan to Feb 2025)For Jewal Palace Pte Ltd, we conducted fast-track A&A electrical works ...
🧯 The Gateway Building – Fire Alarm System Installation (Since Jan 2025)SMT Engineering is currently engaged in the installation and commissioning of ...
Spottiswoode Residences – Maintenance Work (May to Dec 2024)SMT Engineering was appointed to carry out preventive and corrective electrical ...
🏗️ 10-Storey Residential Project with Sky Terrace (Since Aug 2024)In this ambitious residential development, SMT Engineering was responsible for the ...
Bangla House – Electrical A&A Works (Feb to May 2024)This project involved full-scale electrical renovation and system upgrade for a ...
NUS Block E3A – A&A Electrical Works (April to July 2024)Personal Gift🔧 NUS Block E3A – A&A Electrical Works (April to July ...